suzhou information banner
  1. Home
  2. /
  3. Jin Ji Lake
  4. /
  5. Jinjihu Tunnel fully opened to traffic

Jinjihu Tunnel fully opened to traffic

The Xinghu Street Ramp and also Changle Road Ramp of the Jinjihu Tunnel金鸡湖隧道 were opened to web traffic recently, noting that the Jinjihu Tunnel has actually been completely open.

The 6.04-kilometer two-way six-lane tunnel starts from Xinghai Street in the west, passes along Zhongxin Method and also finishes at Nanshi Street in the east. Working as an arterial roadway, the main line of the tunnel was open to web traffic at the end of last December. Going into procedure, both ramps will link Xinghu Street and Jinjihu Passage and also provide higher traveling convenience for homeowners near Changle Road.

The Jinjihu Tunnel has actually recognized the quick link between Zhongxin Avenue and also such arterial roads as Xinghai Road, Xinggang Street, as well as Xinghu Road, as well as provided more alternatives to the homeowners taking a trip in between both sides of the Jinji Lake.

Reminder

1. Due to building on Suzhou Rail Transit lines, the Xinghai Street departure, Xinggang Road entry and also exit, Xinghu Street entry as well as departure, and also Nanshi Road entryway as well as departure will go through construction in the future. Please focus on more notice.

2. The tunnel will be shut for maintenance from 12 a.m. to 6 a.m. each day. Travelers can make a detour through Xiandai Method as well as Jinjihu Opportunity.

Leave a Reply

Your email address will not be published. Required fields are marked *